In January 2016, reconstruction of the tower building was commenced by CL-Evans as general contractor. Only the original reinforced concrete skeleton of the building was left, the rest being pulled down and replaced, and the seventh aboveground floor was added as an extension. The building approval for this project was issued in October.

In January 2016, reconstruction of the tower building was commenced by CL-Evans as general contractor. Only the original reinforced concrete skeleton of the building was left, the rest being pulled down and replaced, and the seventh aboveground floor was added as an extension. The building approval for this project was issued in October.

Další aktuality

Dostavba Q 19

Dostavba Q 19

V 1. čtvrtletí 2017 bude zahájena dostavba propojení haly Q18 a Q19, které spolu s novým X-dockem přinese výrazné zvýšení efektivity a kvality práce společnosti Helicar, a. s. Společnost poskytuje logistické služby společnosti Gorenje, spol. s r. o.

Celý článek
Budova Q1

Budova Q1

V lednu 2016 začala rekonstrukce výškové budovy, kterou prováděla jako generální dodavatel společnost CL-Evans. Při rekonstrukci byl z původní budovy ponechán pouze železobetonový skelet a nově bylo dostavěno sedmé nadzemní podlaží.  V říjnu byla výšková budova zkolaudována.

Celý článek

Nabízíme

Skvělá dostupnost
Pouze 20 km od centra Prahy

12 let zkušeností
v oboru
Moderní kanceláře
pro velké i malé firmy
Napojení
na železnici

Reference

Helicar
Gorenje
All In Logis
Aglio
Master Truck
AMI
NC Wega
SICF